 Work supervision in the construction

Work supervision in the construction. NORMS FOR CONSTRUCTION And INSTALLATION STEEL FOR CONCRETE HYDRAULIC ENGINEER. A.01. - Rods, I sweep, cables, meshes, unfolded metal and other steel profiles, that placed inside or outside the concrete Hydraulic engineer, in ductos or without them, serve to help this a to absorb any class of efforts. A.02. - The steel for concrete Hydraulic engineer to that this norm talks about, are those that use in the construction of strained structural work elements, prefabricated normal and concrete potentates and prestressed.

MATERIALS. B.01. - The steel that is used will have preferredly to be of a mark of recognized quality. No steel of new mark, or without antecedents of good quality, will be authorized until it has become, in continuous form and during 6 months at least, the contractor will have to indicate as it is the lot of steel that is going away to use in the work, to make the sampling and tries of the same one, before she begins to use this steel. B.02. - When circumstances that makes be conceited that exist the characteristics of the steel for the concrete hydraulic engineer have been modified will have to become new laboratory tests, so that its use or rejection is decided on. B.03. - The steel for concrete hydraulic engineer will have to arrive at the work without oxidation detrimental, free of oils to fats, you break, grudges, hojeaduras and deformations of the section. B.04. - The steel for reinforcement will have to be stored under sheds, classified according to its type and section, having to carefully protect against the humidity and chemical alteration. B.05. - The steel for concrete hydraulic engineer, who does not fulfill the stipulated quality, will have to be rejected, to be marked and to be retired of the work. B.06. - The electrodes that are used in the welded joints will have to store carefully conserving the boxes or packing of make, in dry and clean places. The electrodes that remove from their packages will have to be used within a period of 4 hours. The electrodes that are not used within that lapse or those that been they have exposed during 1 hour will have to be dried in furnaces to temperature of 260 degrees Celsius, before being used. The electrodes were rejected that have gotten wet.

EXECUTION REQUIREMENTS. C.01. - The reinforcement rods bent slowly in cold, to give the form them that fixes the project, whatever it is his diameter. C.02. - The duplexes or hooks of anchorage will have to become in agreement with the following thing: a) In stirrups the duplexes will become around a cylindrical piece that has an equal or greater diameter of 2 times the one of the rod. b) In smaller rods of 2,5 cm. of diameter, the anchorage hooks will have to become around a cylindrical piece that has a diameter equal or greater to 6 times the one of the rod, or that is doubled hooks to 180 degrees or 90 degrees. c) In all the rods of 2,5 cm. of diameter to greater, the anchorage hooks will have to become around a cylindrical piece that have an equal or greater diameter of 8 times the one of the rod, or that is hooks doubled to 180 or to 90 degrees. C.03. - All the rods of reinforcement will have to be placed with the lengths that the project fixes and joints were not used. C.04. -

The joints will be of two types: Overlapped or welded, and the type will have to be used that fixes the project. Except for indication in opposite, in a same section it will not be allowed to join but of 33 % of the reinforcement rods, and joints in sections of maximum effort of tension were avoided. C.05. - When the project does not fix another thing, the overlapped joints will have a minimum length of 40 times the diameter or side, of the corrugated rod. They were placed in the points of smaller effort of tension; its positioning in places was not authorized where the section does not allow a free minimum separation of once and average the maximum size of the heavy aggregate, between the joint and the next rod but. C.06. - In the welded joints, the ends of the rods or I sweep will be united by means of weld of the electrical arc and metallic electrodes. The manual labor of the soldering irons will have to be described previously for the conditions in which the work was executed. The electrodes were used in the position indicated for their type and will have to be of a classification so, that they are able to transmit 1,25 times the force of flow of tension of the rods or I sweep, with no need to exceed the Maximum resistance these. The preparation and positioning of the ends of the rods or sticks will be as it is indicated next: a) The surfaces to weld and the adjacent ones them, up to 5 cm. to one and another side of the meeting, will have to be clean, without laminate grudges and free of I oxidize, painting, fat, cement or any other material stranger.

The presence of laminate grudges was tolerated that resist vigorous brushed with wire brush, as well as a light layer of drying oil or antirust covering. b) The surfaces in which it is going away to deposit the weld in meetings to top with complete penetration, will have to be smooth and uniform, without irregularities, flashes, it tear, cracks or other defects that unfavorably affect the quality or resistance of the weld. c) The cuts necessary to prepare bevels will have to take control with oxyacetylene blowpipe or segueta; when it is used blowpipe will have to eliminate the dreg produced by the cut, and the final finished one of the surfaces in which it is going away to deposit the weld had to be similar to which it is obtained in cuts with segueta. In case of being necessary, the cuts with blowpipe will be corrected with segueta, emery or machining them. d) The details and the sequel of elaboration of meetings were planned so that comfortable access to the surfaces is always had in which the weld was deposited, and that this can be placed in all the cases, even in the possible unfavorable position but. e) The parts to unite and the auxiliary organizational elements, will have to be aligned suitably to reduce the eccentricities to the minimum. f) When fillet welds are used, the two I sweep or the bar and the plate of joint will have to be placed in complete contact. The separation between the two parts that are going to receive the cord will not have to be greater of 5 millimeters, nor of ¼ of diameter of the bar. g) In unions to top I sweep it will have to be aligned carefully, before beginning to deposit the weld, so that the axes of the sections agree to unite. It will be had as much special well-taken care of in, which the edges of bevels agree exactly, in size as in alignment.

 
  Architecture in general
  Courses Online.
  Your donation
  Your publicity in Arqhys.com

 

 
Arqhys Online:
 » Collaborating
 » Your publicity
 » Links Me
SECTIONS
 » Beginning
 » Construction
 » Skyscraper
 » Introduction
 » History I and II
 » Works
 » Architects
 » Monuments
 » Links friends
 » Downloads
PUBLICITY
WORKS OF:
 » The concrete
 » Point

 » Structures

 » History of the art
 » Houses
 » Mortgages
 » Wiring
 » Painting
 » The Space
PUBLICITY

Arquitectura en español | Site Map | Contact

 

Copyright 2004 ArqHys. Conditions of use.