CONSTRUCTIVE PROCESS - RUBBLEWORK
WITH BLOCK OF VERTICAL PERFORATION.
The commentaries that appear refer the aspects that must specifically be
considered for the structural rubblework with block of vertical perforation. One
specifically omits all the other aspects that in all type construction must be
considered: Laying of foundations:
• The totality of the voussoirs or rods of starting of vertical reinforcement is
due to correctly locate and to place:
• Verticality.
• Hook to the bottom of the foundation.
• Correct location in plant to obtain coincidence with the center of the
vertical cells of the block.
• Correct mooring to diminish displacement risk.
• To verify location and verticality while concrete the this fresh air.
First line in first level:
• To draw up and to sway all the walls.
• The structural planes indicate in which corners ties between the structural
walls exist.
• Where tie does not exist, they indicate beginning and aim of each wall.
• To form in dry, without beats, the first line of all the walls.
• To verify the location of voussoirs and pipes (tolerance)
• To define locations of average bricks to unite and mouse holes or windows of
cleaning of cells.
• To make corrections of voussoirs: - Court and replacement with epoxy anchorage
- Slight doubles
• To retire forms in dry.
• To stick first line with mortar, verifying the exactitude of its superior
level |