Barbed wire | History of the architecture | Architecture & Construction

 Rep. Dom. 

  Search:

BEGINNING

LINKS

COURSES

VIDEOS

AUTOCAD

PRIZES

SEARCH

  ArqHys Google

 

 

Versión en español  Add to favorites  Add to page of beginning

 Barbed wire

Barbed wire. WALLS WITH PUAS WIRE. Majorities. The walls will be constructed in agreement with the shown thing in the planes and according to these specifications. In order to initiate the work the wall will be located, which will be constructed following the profile of the ground. When the wall crosses sudden and narrow ditches or other depressions, posts of greater length with the additional wire of prongs in the inferior part will be placed del wall to close it. Before constructing the wall the site will be sprightly where it is going to be placed and the irregularities of the surface will be made level in such a way that the wall follows its contours general. To each side a zone of 0,60 m of wide will be sprightly and the trunks will retire, weeds, rocks, trees or other obstacles that prevent their easy construction.

Materials.

Posts. The posts of concrete will be reinforced or wood immunized to the emptiness and pressure in agreement with corresponding norm ICONTEC. 50 cm. like minimum will be placed in the form and to the separation indicated in the planes, buried, of 2.20 ms of length, except opposite indication. After buried they will have to excel of the surface of the land the length fixed to the planes. In the changes of direction, inner doors, or to a maximum distance of 100 ms, will settle posts of weather buried 80 cm. like minimum, braced properly by means of foot of friends, constituted by posts of sufficient length or pieces of wood sawed and fitted to about 15 cm. of the superior end in grooves worked before the immunization in the weather post. The posts will settle in the hollows excavated in the natural land and the space between the edges of the hollow and the post will fill up with concrete of 175 Kg/cm2. Once finished the filling, the posts will have to be aligned and plumbed. Round wood posts. They will be immunized in agreement with norms ICONTEC for the effect and will have the diameter specified in the planes, with a Maximum tolerance by defect of 20%. The specified diameters talk about to wood without crust; they must have pieces, splits, neither cracks of more than 6 mm wide nor greater of 90 cm. in length. They will be buried downwards with the greater diameter, following the vertical and aligned by the side that goes the wire.

Posts of concrete.
They will make with the concrete type of, reinforcement and dimensions indicated in the planes or by the Inspector. Posts will not settle that present/display cracks or fractures and will have minimum curing of 14 days, before their installation. Wire. The barbed wire will be of two twisted steel threads, galvanized in hot caliber no. 12.5 ASW. It will have prongs of 4 ends of hot wire galvanized in, caliber 14 ASW spaced to a maximum of 15 cm. The wire used for the fixation of the barbed wire to posts of concrete, will have to be soft, smooth, galvanized in hot and calibrates no. 12. Staples. The staples will be of galvanized steel wire no. 9 of 1"for posts of hard wood, and 1,5" for soft wood posts. Positioning and Fixation of the Wire. If something different is not specified, the wires will be placed of the inner side of the lot when it corresponds to medianeríes, or of the side of the route (wide of zone), fixing threads parallel, stretched and tempering to the indicated height and spacement in the planes. In terminal posts and the inner doors, the barbed wire will become involved around the post and it will pay attention at least to three staples, doubling, tieing and tightening the loose ends. To other posts one will pay attention with not less than a staple by each thread. Measurement and Payment. The unit of measurement will be the meter (m), measured on the slope. In his price they will be including all the direct costs and indirect for the provision, it transports and positioning of the different elements and the execution from works necessary to give the walls to the Interventory.

 
  Architecture in general
  Courses Online.
  Your donation
  Your publicity in Arqhys.com

 

 
Arqhys Online:
 » Collaborating
 » Your publicity
 » Links Me
SECTIONS
 » Beginning
 » Construction
 » Skyscraper
 » Introduction
 » History I and II
 » Works
 » Architects
 » Monuments
 » Links friends
 » Downloads
PUBLICITY
WORKS OF:
 » The concrete
 » Point

 » Structures

 » History of the art
 » Houses
 » Mortgages
 » Wiring
 » Painting
 » The Space
PUBLICITY

Arquitectura en español | Site Map | Contact

 

Copyright 2004 ArqHys. Conditions of use.